1.780.991.5000

Huge savings while using Road Badger

Woodland County impressed with efficiency of machine

Woodland County evaluated the machine while completing 14 km of MC250 cold mix rehabilitation. They documented an average savings of $4,600 per kilometre in materials and equipment compared to their existing method and budgeted costs.