AEC ECUADOR

 

AEC Ecuador was performing regular road maintenance at an average of 1km per day. The aggregate utilized for the road is uncrushed washed river rock. AEC Ecuador is not isolated in the increasing worldwide problem of dwindling non-sustainable aggregate resources - subsequently escalating the costs associated with it.

 

With preliminary testing, AEC Ecuador has reported that with no additional equipment, they can double current road maintenance production to 2km/day. If an additional packer was utilized, 4km per day could be realized. This production increase has been estimated to save up to (USD) $ 36,162 per month. This cost savings is calculated only on operating costs, and does not include the additional savings for aggregate costs - as no additional product was required to rehabilitate the road.

 

Road Badger expects AEC Ecuador to see continued operational savings and major reductions in their aggregate usages as the Road Badger becomes a standard in Road Maintenance practices.

 

Download the report here: AEC_Testimonial.pdf

 

Download the cost comparison here: AECEcuador.pdf

 

Learn more about Encana and its Ecuador operations here.

 

     

 Legal Notices  Terms of Use  Privacy Policy